Licensed Professional Engineers · Ontario-wide

Open Up Your Home. Remove That Wall — Safely.

Sealed P.Eng. drawings for load-bearing wall removals across Ontario — beam sizing, posts, and footings engineered for your exact span and loads, permit-ready so your open-concept project passes inspection.

P.Eng.
Sealed on every project
Ontario-wide
Province-wide service
day
Typical response time
What we engineer

Everything your wall removal needs to pass.

Taking out a load-bearing wall is more than swinging a hammer — here's what we design and seal.

Beam Sizing

We calculate the right beam — steel W-shape or multi-ply LVL — for your exact span and the loads it carries, so the opening is strong, level, and safe once the wall is gone.

Ask about your span

Posts & Footings

A beam is only as good as what holds it up. We design the posts and properly sized footings that carry the load continuously down to solid bearing — no guesswork, no sagging.

Check your load path

Sealed Drawings

You get P.Eng.-stamped structural drawings and calculations — the document your municipality requires to issue a permit and your contractor needs to build with confidence.

Get your drawings

Site Assessment

Not sure if a wall is load-bearing? We assess your home — framing direction, what sits above, and the loads involved — and tell you exactly what removing it will take before drawings begin.

Book an assessment
What we provide

Everything your permit needs, sealed by a P.Eng.

A complete package — from confirming the wall is load-bearing to permit-ready drawings.

01.

Beam & Column Design

Steel or LVL beam sizing, plus the posts and footings that carry the load — engineered and sealed so the opening is safe and passes inspection.

02.

Code Compliance Built In

Load paths, bearing, and deflection all designed to meet the Ontario Building Code the first time — no rejected submissions.

03.

Site & Feasibility Review

We confirm whether the wall is load-bearing, what it carries, and exactly what it takes to remove it — before drawings begin.

04.

Permit Application Support

Guidance through the building permit submission so your application moves smoothly to approval.

How it works

From form to sealed drawings in three steps.

01

Submit Your Project Details

Fill out the short form with your location and project basics. Takes under 2 minutes.

02

Engineering Review

Our P.Eng. team reviews the scope and contacts you to discuss requirements, timeline, and fees.

03

Receive Your Drawing Package

Stamped, permit-ready drawings prepared for your building permit application.

That wall may be doing more than you think.

A load-bearing wall carries the weight of everything above it. Removing one without the right beam, posts, and footings can lead to sagging floors, cracked drywall, and serious structural damage. Sealed engineering from the start keeps your open-concept project safe, permit-approved, and on schedule.

Get a Free Quote
Get started

Get a Free Wall Removal Quote

Tell us about your project and we'll send a quote for the sealed drawings your wall removal needs — usually within one business day.

We typically respond within one business day. All inquiries are confidential.

Thank you

We have received your request and will be in touch shortly.